博文

目前显示的是 四月, 2019的博文

If the Jaw crusher discharge particle size is not up to standard, how can we adjust the jaw crusher?

图片
If the Jaw crusher discharge particle size is not up to standard, how can we adjust the jaw crusher? Jaw crusher discharge particle size is not up to standard, can adjust the jaw crusher outlet.There are three ways to adjust the outlet of the jaw crusher. 1.gasket adjustment: open the adjusting seat with the lifting bolt, check the quality of the rear thrust plate support and the rear wall of the rack, and put or remove a group of gaskets with equal thickness.By increasing or decreasing the number of gasket layers, the discharge port of the crusher decreases or increases.2. hydraulic adjustment: the rear thrust plate is used as the safety device of the crusher.The crusher adopts hydraulic safety device, which is reliable, safe and easy to discharge faults.3. support device adjustment: refers to the bearing part of the jaw crusher, generally using cast-babbitt alloy sliding bearing, it can withstand a greater impact load, and more wear resistance, but to low efficiency, the need for

How much is a set of quarry plant, what equipment does it use?

图片
How much is a set of quarry plant, what equipment does it use? As we all know, gravel is a common material such as construction materials and highway construction materials. The plant mining gravel is called gravel yard, and the plant processing gravel is called gravel yard or stone factory. Granite is about 120~200MPa.Primary crushing usually adopts jaw crusher , which uses the extrusion and bending effect of two jaw plates on materials, crushes the crushing machinery of various hardness materials.The secondary crushing usually adopts impact crusher to produce the particle size of materials.SHUOSEN machine to recognize 300 tons per day of 300mm counterattack crusher feed particle size, discharging size and shape can be adjusted according to customer demand for multi-functional.In addition to the impact crusher, also can choose SHUOSEN machine spring crusher, cone crusher. Main factors for equipment selection can be summarized as follows: (1) the crusher is stable with continuous fee

Operation of Jaw Crusher

图片
Operation Instructions of Jaw Crusher 1.The preparation before starting: (1) Inspect each bearing to ensure whether it lubricates well, and whether there is enough lubricating grease on the toggle plate joints and bearing inners. (2) Check carefully whether all fasteners are totally fastened. (3) Check whether the drive belt is under good condition, and change the belt if any damages can be found. When there is grease contamination on the belt or bell wheel, it can be clean up with a clean dishcloth. (4) Check whether the protective device is under good condition, if there are any unusual events and safety hazards conditions, should correct them and report. (5) Check whether there are any ore or other impurities inside the crushing cavity. 2.The starting of the crusher (1) After inspecting the machine and transmission parts are under good condition, the machine may starts. (2) This machine can only start under empty load conditions. (3) After having started the machine, shut down the

Lubrication of Jaw Crusher

图片
Lubrication of Jaw Crusher In order to guarantee the regular operation and extend the use life of the machine, users should carry regular maintenance to this machine. Pay attention to the lubrication of the rubbing surface frequently, it ensures the regular operation and use life extension of the machine. The lubricating grease used for this machine should be applied according to several factors, such as the operating position of machine, the temperature and so on. Generally calcium base grease or calcium-sodium base grease is adopted. The amount of lubricating grease added into the bearing block is 50%-70% of the volume, and must be replaced once every three months. Make sure clean up with clean gas or kerosene when replacing each time. The lubrication grease muse be injected on the joint of toggle plate and toggle plate gasket before the machine starts. If you want to know more about our equipments details,please contact us Shanghai Shuosen Mining Machine Co.,Ltd www.shuosen

1520 impact crusher is running test for 24 hours.

图片
1520 impact crusher is running test for 24 hours. http://www.shuosencrusher.com/…/pr…/jaw-crusher-shuosen.html sarah@shuosencrusher.com whatsapp:008613598023510

Hydraulic Cone Crusher for Iron Ore Crushing

图片
Hydraulic Cone Crusher for Iron Ore Crushing Iron ore is a relatively hard metal ore which easy to wear on the machine. Therefore, it must be select special mining crushers for metal ore. For the crushing of iron ore, it is mainly primary crushing and second crushing. Primary crushing and coarse crushing: usually adopt jaw crusher, which has simple structure, large crushing ratio, strong crushing capacity, convenient maintenance and low operating cost. It can be used to crush large iron ore to medium-sized granularity. Jaw crusher is very suitable for primary crushing operations. Second crushing: For the iron ore with high hardness, Hydraulic Cone Crusher is the most suitable medium and fine crushing equipment. It can achieve "more crusher and less energy". Generally, the second crushing of iron ore has two sections, one section is mainly medium-sized granularity crushing, and you can be select a standard cone crusher. The feed size is above 20mm; another is fine crushing,

jaw crusher PE900*1200

图片
jaw crusher PE900*1200 http://www.shuosencrusher.com/en/product/jaw-crusher-shuosen.html If you want to know more about our equipments details,please contact us Shanghai Shuosen Mining Machine Co.,Ltd www.shuosencrusher.com sarahzzdshj@gmail.com sarah@shuosencrusher.com

Installment Instructions of Jaw Crusher

图片
Installment Instructions of Jaw Crusher The jaw crusher is supplied by the SHUOSEN company after assembly. Customer should take a full check after having received this machine, in order to prevent any possible damages or loss of the attachment in the course of transporting. 1.Due to large quantity of vibration when the machine works, it is suggested that the machine should be installed on the concrete foundation, in order to reduce noise and absorb vibration reaction forces. In this case, it can avoid vibration influence on the building foundation. To get better effects, hardwood base plate, rubber tape, and other damping materials can be put in the middle of the crusher and concrete foundation. 2.The weight of the foundation is approximately 5-10 times of this machine’s weight, the depth of the foundation should be greater than local frozen depth. With regard to machinery installation and foot screw positions, can be found in the foundation drawing. 3.Before adjusting the discharge

How long is the service life of the jaw plate of the jaw crusher?

图片
How long is the service life of the jaw plate of the jaw crusher? The service life of the jaw plate will be different depending on the use of different customers. The main situations are as follows: Some customers in the use of jaw crusher, jaw plate can be used for more than a month, while some customers can only be used for more than ten days, this phenomenon is mainly due to production in different situation, such as jaw crusher processing by difference of material properties, or jaw crusher in different working hours a day, of course, with the jaw crusher in use process, maintenance of jaw, either one will cause the loss of the service life of jaw crusher jaw plate. In the production, to ensure the service life of the jaw plate jaw crusher, first of all to choose the wear resistance of the jaw plate, then in the use of the jaw plate for good maintenance and maintenance operations, which can reduce the wear in production, to extend its service life. If you want to know more ab

jaw crusher running

图片
900*1200 jaw crusher running http://www.shuosencrusher.com/en/product/jaw-crusher-shuosen.html sarah@shuosencrusher.com

mining machinery in port

图片
Ore processing equipments jaw crusher ball mill spiral classifier http://www.shuosencrusher.com/ If you want to know more about our equipments details,please contact us Shanghai Shuosen Mining Machine Co.,Ltd www.shuosencrusher.com sarahzzdshj@gmail.com sarah@shuosencrusher.com

Attentions of jaw crusher stop and start working

图片
Attentions of jaw crusher stop and start working I. equipment inspection before starting up 1. Check whether the bolts of the frame, pulley and flywheel are loose; 2. Check the jaw plate.Whether the fixed and movable jaw plate and side guard plate are good, whether the bolts are fastened, whether the thrust plate has cracks, and whether the spring pull rod and spring are good; 3. Check whether the safety railing, safety cover and feeding chute are in good condition; 4. Check whether the motor anchor bolt is loose, whether the motor wiring and all instruments in the operation box are intact, and whether the voltage is within the specified range; 5. Check whether there are large pieces of ore and sundry objects in the crushing chamber, whether the v-belt is intact and whether the tightness is appropriate. II. start working 1. The device can only be started when no one is working on or around the device; 2. After starting the host machine, first observe whether the operation of the equi

Mining Machinery Delivery to oman

图片
Chrome ore beneficiation process Production Capacity : 10-280t/h Applied material: Chrome ore/Chromite Ore Beneficiation process:gravity separation. If you want to know more about our equipments details,please contact us Shanghai Shuosen Mining Machine Co.,Ltd www.shuosencrusher.com sarahzzdshj@gmail.com

Reasons and solutions for the shutdown of the jaw crusher

图片
Reasons and solutions for the shutdown of the jaw crusher I.Reasons for the shutdown of the jaw crusher: 1, Jaw crusher Crusher discharge port blocked, causing block material; 2. The triangle belt driving the crusher wheel is too loose, causing the belt to slip; 3, crusher eccentric shaft set bushing loose, resulting in the frame bearing seat on both sides of the gap, so that the eccentric shaft stuck, unable to rotate; 4. The working site voltage is too low, and the host machine is unable to break when it encounters big size material; 5. Bearing of crusher is damaged. II. Solutions for the shutdown of the jaw crusher: 1. Clear the clog at the discharge port of the crusher to ensure smooth discharge; 2. Tighten or replace the triangular belt; 3. Reinstall or replace the tightening bush; 4. Adjust the working site voltage to meet the working voltage requirements of the main machine; 5. Replace bearing of crusher. If you want to know more about our equipments details,please conta

Vibrating Screen

图片
Vibrating Screen Max Feeding size: 400 mm Power: 7.5-55 kw Capacity: 12-800TPH Applied material: limestone, granite, quartz, pebble,iron ore, construction waste, etc http://www.shuosencrusher.com/en/product/Circular-Vibrating-Screen.html

How to reduce the dust of jaw crusher

图片
How to reduce the dust of jaw crusher ? Source of jaw crusher dust Dust is initially caused by ore crushing, part of which is carried by the ore itself, and part of which is generated in the later stage of ore crushing.The general movement trajectory of the ore is as follows: the ore enters the machine from the feed port, is broken to the relevant particle size in the machine, is discharged from the discharge port, and then is transported to the next section of processing equipment by the belt conveyor.It can be seen that the devices that directly contact dust with air are inlet, outlet and belt conveyor.In addition, the use of hopper, protective cover, chute and other materials in the production process will produce a certain height difference, which is another major cause of dust. To solve the problem of jaw crusher dust , the first is to control the dust source with the help of external force to avoid its diffusion, and the second is to improve the local structure of the machin

The jaw crusher should pay attention to the following four problems in long-term storage

图片
The jaw crusher should pay attention to the following four problems in long-term storage: 1.to prevent rust.Jaw crusher should be parked in the dry room, should be based on the outside of the casing anti-rust paint peeling area of the size to determine is the pace of the paint or the whole machine to spray paint to repair.It is strictly prohibited to arrange conductive objects on the battery. The lead-acid battery should be charged once a month and should be placed on a flat ground and covered with wooden boards.The engine should be started once a month during downtime. 2.the battery will be arranged in the dry and anti - freeze place. 3.cover with cover cloth after parking.To prevent the fuel tank from rusting, it should be thoroughly cleaned and reconnected to the negative line. 4.The fuel control lever of the machine should be placed in idle position. If conditions permit, preservatives should be added to make the lubrication of each part create a new oil film and fill the fuel

The reason why metal crash sound appears in jaw crusher when machine is idling

图片
The reason why metal crash sound appears in jaw crusher when machine is idling After the completion of the jaw crusher installation, careful inspection should be carried out to confirm that the jaw crusher equipment is qualified before no-load operation.In the jaw crusher idling may appear the sound of metal impact, the crusher did not put the material, how can there be the sound of metal impact? The metal impact sound of jaw crusher in no-load operation is mainly caused by the unreasonable installation of jaw crusher or the fault. The most likely reasons are: 1. It may be the collision sound between the moving jaw and fixed jaw plate of the jaw crusher, which is caused by too small ore discharge opening and should be adjusted in time. 2.The impact sound appears in the thrust plate support or spacer adjusting device,usually by rod buffer spring elastic disappear or damaged, or cause rotational spring pressure is not tight, when the moving jaw plate, toggle plate, main machine is not

gear cover of BALL MILL-shipping

图片
 gear cover of BALL MILL If you want to know more about our equipments details,please contact us Shanghai Shuosen Mining Machine Co.,Ltd www.shuosencrusher.com sarahzzdshj@gmail.com sarah@shuosencrusher.com

The method to solve the jaw crusher material blocking

图片
The method to solve the jaw crusher material blocking Because of the working principle and equipment design of jaw crusher, jaw crusher often has the phenomenon of material blocking in the production process. The reason of jaw crusher material blocking The main reason for the material blocking problem of jaw crusher is that in the working process of jaw crusher, if there is a high water content of ore material into the crushing chamber, the crusher material containing a water broken into small pieces, then because the water is contained in the material, thus has certain viscosity, when into small pieces of material will be glued together, and plugging in the crushing cavity between two pieces of jaw, material blocking phenomenon;It is also possible that the broken material is mixed with a large viscous thin soil, so that the material is stuck into a block in the broken cavity. The solution of jaw crusher material blocking In order to avoid the phenomenon of material blocking, can be

Belt conveyor for ore processing plant

图片
Belt conveyor for ore processing plant B500  B800  B1200 B1500 If you want to know more about our equipments details,please contact us Shanghai Shuosen Mining Machine Co.,Ltd www.shuosencrusher.com sarahzzdshj@gmail.com sarah@shuosencrusher.com

How to ruduce he loss of the movable jaw hole?

图片
How to ruduce he loss of the movable jaw hole? In the mining of mineral resources, the most commonly used mineral processing equipment is the jaw crusher .The work of the jaw crusher is to use the kinetic energy generated by the jaw to exert extrusion, bending, impact, shear and grinding on the materials to break the materials, so the jaw plate is also the most vulnerable parts, the common form of jaw abrasion is the jaw grinding hole, how to reduce the loss of jaw crushing motor jaw hole to the minimum? 1. Adopt the inner bore bushing, use the tool to wear the inner bore bore bigger, select two bearing bushing, the outer diameter and the inner bore of wear jaw, the inner bore and the outer diameter of rolling bearing match closely, the bearing bushing is set in the inner bore of movable jaw, in order to ensure the set is stable, between the jacket and the inner bore of movable jaw can be installed 6 stable nails.This method requires attention to the thickness of movable jaw wall, t

mixing barrel delivery--for chrome ore beneficiation

图片
Mixing Barrel http://www.shuosencrusher.com/en/product/Mixing-Barrel.html Diameter of barrel: 0.5- 4 m Power: 1-37 kw Effective volume : 0.15-45 m3 Applied area : Ore beneficiation, construction materials, road and railway construction. Product description: Mixing Barrel is the necessary equipment to extend the medicament reaction time and strengthen the drug reaction quality. If you want to know more about our equipments details,please contact us Shanghai Shuosen Mining Machine Co.,Ltd www.shuosencrusher.com sarahzzdshj@gmail.com sarah@shuosencrusher.com

4 kinds Jaw crusher discharge gate adjustment mothods

图片
4 kinds  Jaw crusher discharge gate adjustment mothods 1. spacer adjustment: use the lifting bolt to open the adjusting seat, between the rear thrust plate support and the rear wall of the frame, put or take away a group of spacers of equal thickness.By increasing or decreasing the number of spacer layers, the discharge port of the crusher decreases or increases.Spacer adjustment can be multi-level adjustment, the machine structure is relatively compact, can reduce the weight of equipment, but the adjustment must stop machine, large jaw crusher use this adjustment method. 2. hydraulic adjustment: rely on hydraulic cylinder to adjust the discharge port, the use of the rear thrust plate as a crusher safety device.The jaw crusher adopts hydraulic safety device, which is reliable, safe and easy to discharge faults. 3. support device adjustment: in the jaw crusher bearing part, generally cast with babbitt alloy sliding bearing, it can withstand a large impact load, and more wear

How to clean the garbage in the crushing chamber of the jaw crusher

图片
How to clean the garbage in the crushing chamber of the  jaw crusher After working for a period of time, the jaw crusher will always leave some waste in the crushing chamber, and the accumulation of waste will increase the weight and friction of the jaw crusher itself, so that the jaw crusher will spend more energy in the work to deal with these useless work.Long-term failure to clean will also lead to equipment damage, so in order to protect the safety of spare parts, increase the efficiency of equipment, it is necessary to regularly clean the garbage inside the jaw crusher.The garbage cleaning work is generally carried out at the end of the day, so as not to affect the progress of the work, or can be carried out in a certain day when the jaw crusher does not work. Pickling and caustic washing are generally used to clean the equipment.The so-called pickling is the concentration of 20 percent of hydrochloric acid solution in the jaw crusher crushing chamber in the dirt, wait fo

When replace the jaw crusher wear parts

图片
When replace the jaw crusher wear parts 1. The fixed lining board, movable jaw lining board and lining boards on both sides of the jaw crusher are the most easily to be worn out, and the severe wear will lead to the increase of product particle size.At the initial stage, the tooth plate can be used to turn the tooth plate, or the use of the upper and lower two heads.Jaw plate wear, mostly in the lower middle, when the tooth height wear off 3/5, then need to replace a new liner.When the lining plates on both sides wear out 2/5, they also need to be replaced. 2. If there is little wear on the shaft, simply to repair its geometry, turn the shaft on a lathe so that the journal reaches the correct geometry, and then reduce the bearing bore accordingly.However, after several such treatments, if the journal size is reduced by 5% from the original, no more turning is allowed and a new shaft should be replaced. 3. Determination of wear of bearing bush of jaw crusher: jaw crusher works under